Scaffolding

We service some of the most demanding markets with rigorous timeframes and safety requirements. We know our customers are under considerable pressure and must be supported by a reliable and capable partner. We pride ourselves on using the most technologically advanced scaffolding materials and products available that are constructed to adapt to various extreme conditions.

We have many flexible solutions to make your scaffold project successful whether it’s access for maintenance, capital projects, outages or turnarounds. We have the perfect combination of highly skilled and experienced teams for your scaffold design, erection and dismantle.

With our extensive inventory of mobile and stationary industrial scaffolding systems strategically located throughout the United States, we can respond immediately to your needs-wherever you are. Each of our products meets or exceeds rigorous technical and regulatory requirements while conforming to the latest OSHA compliances.

PERI-UP

PERI-UP Rosett Flex modular scaffolding system allows for the greatest possible flexibility. This is achieved by using a minimum number of components. The system is perfect for the erection of working platforms and stair towers as well as assembling reinforcement scaffolding. The flexibility of PERI scaffolding equates to saving time and money.

The main components of the PERI-UP modular scaffolding such as standards, ledgers and decks are pre-engineered to have a uniform length and width grid arrangement. Industrial decking is available in lengths of 50 cm (19.685 in) up to 3.0 m (9.84252 ft) in 25 cm (9.84252 in) or 50 cm increments with widths of 25 and 37.5 cm (14.76378 in). This allows interconnecting to any structure and adjustment to be made to suit each project. The 25 cm industrial decks were engineered for working platforms to be completely covered without any gaps.

The PERI gravity lock is a self-locking ledger connection which allows fast and safe assembly. Due to the special node rigidity and the enormous load carrying ability of the connection, PERI-UP scaffolding has an extremely high load-bearing capacity. PERI scaffolding is one of the most unique scaffolding systems on the market. The horizontal members have been tested and certified as suitable for tie-off up to 3 meters in length. This allows more flexibility and increases productivity for workers while using the system.


Broad Museum Los Angeles, California     

The Broad is a new contemporary art museum being built by philanthropists Eli and Edythe Broad on Grand Avenue in downtown Los Angeles. The museum will be home to the nearly 2,000 works of art in the Broad collections and will open on September 20, 2015. With its innovative “veil-and-vault” concept, the 120,000-square-foot building will feature more than 50,000-square-feet of public gallery space on two floors to showcase The Broad’s comprehensive collections and a central “vault” to house The Broad Art Foundation’s worldwide lending library.


System Scaffolding

We utilize a system scaffolding with an engineered modular connection which has evolved from the general principles of tube and clamp scaffolding.

One of the differences between tube and clamp scaffolding and system scaffolding is the connection of the uprights (standard) to the horizontal members (transoms and ledgers) and the diagonal members (braces). The posts are set with fixed connection points that are interconnected at predetermined levels.

This connection between the standard to the transoms and ledgers is a mouth piece and rosette device which is also used for the connection of the various diagonal members or braces.

Other Systems

Other systems we offer are frame scaffolding and Tube & Clamp knowing not all job sites are the same.